Open tender

Playground Equipment and Safety Surfacing Installation at Wormholt Park

Tender closes
32d
11 Sept 2026 · in 5 weeks

Upgrade Wormholt Park playgrounds with new equipment, safety surfacing, and access gates including design, installation, and site restoration.

United Kingdom· LondonPublished 10 Aug 2026· TodayFind a Tender

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closes
    11 Sept 2026
    32 days left
  • Sector
    Browse related listings
  • Location
    United Kingdom
    London

Lifecycle

Open

32 days left to bid. Opened today, deadline 11 Sept 2026.

10 Aug 202611 Sept 2026

Brief

Wormholt Park requires a comprehensive playground upgrade involving the design, supply, and installation of new play equipment suitable for multiple age groups, installation of wetpour safety surfacing to meet current safety standards, self-closing access gates for controlled entry, and associated groundworks. The project scope includes site inspections, reinstatement of affected areas, and full project handover. Suppliers should have experience in playground design and installation, safety surfacing systems, and site restoration. All work will be carried out within existing play areas to minimize disruption.

More from London Borough of Hammersmith and Fuham (LBHF)

4 listingsView all →

Open in Construction

4 open listingsView all →