Refurbishment and Upgrade of Point of Fethaland Lighthouse in Shetland
Refurbish and upgrade the Point of Fethaland Lighthouse on Shetland's northern coast, including asbestos survey, fence replacement, safety gate installation, and redecorating with helicopter logistics support.
Decision brief
4 fields- Contract value£43,740Pounds sterling
- Closing dateRollingNo closing date published
- SectorBrowse related listings
- LocationUnited KingdomScotland
Suppliers
1 supplier- Dart Industrial Services LtdLead contractor
Lifecycle
AwardedContract awarded. Originally published 2 months ago.
Brief
Track record
3 awards · 3 winnersNo single supplier dominates the field.
In construction, NORTHERN LIGHTHOUSE BOARD has awarded 3 contracts to 3 suppliers.
- RS Merriman Limited1× · 33%
- Accted Ltd1× · 33%
- Dart Industrial Services Ltd1× · 33%
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, PDP MECHANICAL & ELECTRICAL LIMITED — the field to beat, or your route in as a partner.
More from NORTHERN LIGHTHOUSE BOARD
Ignition SCADA System Operation and Maintenance Support Services
Provide five-year operation and maintenance support for Northern Lighthouse Board's Ignition SCADA platform monitoring navigation aids across remote sites.
Remote Terminal Units and M2M Communications Management Services
Five-year contract to supply and manage M2M communications services and Remote Terminal Units for NLB operations, including approximately 260 SIM cards and 185 RTUs with flexibility for additional purchases as needed.
Historic Building Roof Restoration and Repairs
Conservation-focused roof restoration and repairs for a Grade A listed historic building, including slate replacement, leadwork, timber repairs, and rainwater goods work.
Dry Dock Services for NLV Pharos - 20 Year Special Survey (January-February 2027)
The Northern Lighthouse Board seeks a UK or European dry dock facility for a 4-week 20-year special survey of the 3,672-tonne NLV Pharos vessel, scheduled January-February 2027, with tender submission deadline of 8 September 2026.
Open in Construction
Playground Installation and Landscaping Project - Knockmore, Co Mayo
Installation of a new playground with landscaping, surfacing, and boundary works in Knockmore, County Mayo.
Traceability System for Precast Concrete Tunnel Segment Supply Chain
Develop an integrated traceability and monitoring system to manage the complete lifecycle of 39,000 precast concrete tunnel segments from manufacturing through installation.
Fire Safety Audit and Void Protection Survey at Multiple Depots
Multi-location depot fire safety survey and void protection assessment to identify non-compliances and develop a comprehensive fire protection improvement plan.
Port of Dover Border Control Kiosks - Design and Installation Project
Supply, design, manufacture, and install 9 prefabricated border control kiosks at Port of Dover with full testing and commissioning services.