Awarded contract

Shaft Pump Replacement for Wheal Jane Mine Water Treatment Plant

Awarded
£47.5k
Published 10 Jun 2026

Supply and installation of a 55 kW shaft pump system for Wheal Jane Mine Water Treatment Plant pump replacement.

United Kingdom· EnglandPublished 10 Jun 2026· 2 months agoFind a Tender

Decision brief

4 fields
  • Contract value
    £47,524
    Pounds sterling
  • Closing date
    Rolling
    No closing date published
  • Sector
    Browse related listings
  • Location
    United Kingdom
    England

Suppliers

1 supplier

Lifecycle

Awarded

Contract awarded. Originally published 2 months ago.

10 June 2026
Awarded — no open tender advertised

Brief

This opportunity involves supplying and installing a new 55 kW shaft pump at Wheal Jane Mine Water Treatment Plant to replace the existing pump. The pump will be connected to 6-inch Wellmaster hoses and require 80 metres of 35mm x 4-core electrical cable for operation. Suppliers should be experienced in mining water treatment equipment, pump installation, and able to work with industrial-grade hoses and electrical systems. The project is suitable for companies specializing in mining infrastructure, water treatment equipment, or industrial pump systems.

Track record

1 award · 1 winner
Thin record

Only 1 prior award here — too little to read.

In manufacturing, MINING REMEDIATION AUTHORITY has awarded 1 contract to 1 supplier.

Who wins here
  1. WILO (U.K.) LTD1× · 100%

Across manufacturing, the most active winners are Lord Combustion Services Limited, JACKSON LIFT SERVICES LIMITED, FRIGOMOTORS, d.o.o. — the field to beat, or your route in as a partner.

More from MINING REMEDIATION AUTHORITY

4 listingsView all →

Open in Engineering

4 open listingsView all →