Mining Site Capping and Ground Reinstatement Works
Sealed bid opportunity for Phase 3.4 capping and reinstatement works at the former Limehurst Colliery mining site, including shaft sealing and ground stabilization.
Decision brief
4 fields- Contract value£1,652,686Pounds sterling
- Closing dateRollingNo closing date published
- SectorBrowse related listings
- LocationUnited KingdomEngland
Suppliers
1 supplier- BETHELL CONSTRUCTION LIMITEDLead contractor
Lifecycle
AwardedContract awarded. Originally published 2 months ago.
Brief
Track record
17 awards · 9 winnersNo single supplier dominates the field.
In manufacturing, MINING REMEDIATION AUTHORITY has awarded 17 contracts to 9 suppliers.
- NAL PLANT LIMITED3× · 18%
- BETHELL CONSTRUCTION LIMITED2× · 12%
- Soil Engineering Geoservices Ltd2× · 12%
+3 more suppliers
Across manufacturing, the most active winners are NAL PLANT LIMITED, JIM DAVIES CIVIL ENGINEERING LIMITED, German Road Service GmbH — the field to beat, or your route in as a partner.
More from MINING REMEDIATION AUTHORITY
IT Hardware Purchase Contract
Pre-approved call-off contract for IT hardware purchases, from peripherals to laptops, through the CCS Framework RM6098.
Annual Mine Entry Visual Inspections Across UK Coalfields
Provide annual visual inspections of 10,000 mine entry locations across UK coalfields in England, Scotland, and Wales.
Ground Stabilisation Framework Tender - Drilling and Grouting Services
The Mining Remediation Authority seeks supplier feedback to inform a new ground stabilisation framework covering drilling, grouting, and remediation services across England, Scotland, and Wales.
Ground Investigation Framework Renewal
The Mining Remediation Authority is consulting with experienced organisations to help design a new multi-territory Ground Investigation Framework covering site investigations, drilling, testing, and reporting services.
Open in Construction
Central Heating Systems and Boiler Replacement Services
Dudley MBC seeks contractors to replace central heating systems and boilers in council properties while improving energy efficiency and ensuring gas safety compliance.
Refurbishment of 33 Leeson Street Lower, Dublin 2
Full property refurbishment including interior fit-out and basement reconfiguration with structural, mechanical, and electrical works in Dublin city center.
Modular Unit Design, Supply and Installation at ARC Healthy Living, Irvinestown
Fermanagh and Omagh District Council seeks qualified contractors to design, supply, and install a modular unit at ARC Healthy Living as part of a PEACEPLUS-funded community space enhancement project with an 18-week total timeline.
Timber Treatment and Dampness Control Services for Housing Stock
Renfrewshire Council seeks a timber treatment and dampness control contractor to service its housing stock through a measured term contract.