EKFB JV is inviting Builders Merchants to express their interest in supplying drainage materials directly to the site for the C23 project, part of the HS2 Main Works Civils Contracts. This project includes three delivery areas: North Chilterns to Aylesbury (NC2A), Calvert to Greatworth (C2G), and Gr
Tender closed on 2 Feb 2026. Awaiting award.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
EKFB JV seeks consultants to produce as-built surveys, design documentation, and construction assurance for three delivery areas of the HS2 C23 project.
EKFB JV is seeking waste management service providers for the HS2 C23 project through a multi-area framework procurement exercise.
EKFB seeks suppliers to hire 8-wheel tipper wagons for the HS2 civil engineering project across three regional areas in support of extensive earthwork and construction activities.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.