This contract involves the replacement of the southern retaining wall of Stock Ghyll (Main River) with similar hard engineering solutions, including concrete and de-constructed stone. The project will also require temporary dewatering of the work area using rock bags and a mechanical pump. Suppliers
Contract awarded. Originally published 1 year ago.
Structural assessment and abnormal load rating determination for A590 Jubilee Bridge in Walney, including CS470 review if required.
Design and rebuild of a 7-meter collapsed retaining wall section retaining 2.9 meters of highway, with work to be conducted using out-of-river methods.
Vegetation removal, masonry repairs, and selective rebuilding of the River Kent retaining wall in Kendal over a 200m section.
Tender for domestic abuse supported accommodation services across South Lakeland, Eden, and Barrow localities with core accommodation, outreach, therapeutic, and lived experience support components.
Supply and install two external storage units for mobility scooters with associated installation works.
Weston College Group is tendering for a Principal Contractor to manage the complete decommissioning, dismantling, and environmental restoration of the Construction Training Centre site.
Experienced contractors needed to remove invasive scrub from 20 hectares of protected peatland in Northern Ireland while maintaining strict environmental protection standards during winter operations.
Betsi Cadwaladr University Health Board is appointing a design and build contractor for a new primary care centre in Waunfawr through a two-stage JCT procurement process.