EKFB JV seeks a specialist subcontractor to construct footway and accommodation overbridges for the HS2 NC2A section, including structural concrete components, drainage, waterproofing, and ancillary works.
6 days left to bid — closing this week. Opened today, deadline 17 Jun 2026.
Specialist subcontractor required to deliver highway realignment, drainage, and surfacing preparation works on the HS2 North Chilterns to Aylesbury project.
The Greatworth to Southam (G2S) section is part of the C23 section of the HS2 project, managed by EKFB Joint Venture (JV). This area is adjacent to the works being carried out by BBV from Birmingham to Long Itchington. The G2S section is divided into three parts: North (Southam), Central (Chipping W
The Greatworth to Southam (G2S) section is part of the C23 section of the HS2 project, managed by EKFB JV. This area is adjacent to the works being carried out by BBV from Birmingham to Long Itchington. The G2S section is divided into three parts: 1. North - Southam 2. Central - Chipping Warden
Eiffage Kier Ferrovial BAM (EKFB) Joint Venture is inviting suppliers to express their interest in providing site consumables for the C23 project, part of the HS2 Main Works Civils Contracts. This project covers three areas: North Chilterns to Aylesbury, Calvert to Greatworth, and Greatworth to Sout
Contractor opportunity to upgrade and refurbish Ardglass Parish Church with mechanical, electrical, and general refurbishment works over 4 weeks from August 2026.
Supplier needed to design, manufacture, and supply precast roof panels for Euston Scissor Box with full fabrication and temporary works support.
Contractor required for 6-week mechanical, electrical, and refurbishment project at Altnaveigh House community facility, starting August 2026.
Boiler replacement works at Singlegate Primary School scheduled for summer 2026 (21 July - 31 August), with submissions via London Tenders Portal only.