Civil works and CDM services to replace the ISO11 fumigation lobby, including structural modifications, new loading/unloading areas, and external staircase replacement with full regulatory compliance and project management.
Tender closed on 23 Sept 2026. Awaiting award.
Supply, install, and maintain a modern 22-cabinet Key Management System to replace an end-of-life system and ensure secure access control and regulatory compliance across the institute.
The Authority is looking for an experienced payroll services provider to manage accurate, compliant, and timely payroll processing.
Supply design, build, installation and qualification services for a new fumigation lobby and air handling unit at an ISO11 animal research facility.
Construction of a protective enclosure for transformer and switchgear equipment serving multiple institutional research buildings and future developments.
Supply and installation of 1,300 meters of 2.4-meter palisade fencing with safety equipment at Ard Gaoithe, Clonmel.
Mechanical heating system upgrade project at Salesian College Celbridge involving decommissioning and replacing the central heating installation in the main building.
Construction of a two-storey special education extension for Bunscoil Ris primary school in New Ross, featuring a dedicated SEN unit and four teaching rooms.
Armagh City, Banbridge and Craigavon Borough Council is inviting contractors to remove invasive rhododendron from 50 hectares at Peatlands Park SAC as part of a cross-border peatland restoration programme.