Royal United Hospitals NHS Foundation Trust requires replacement of Lift 19 with a new lift system meeting current safety and operational standards.
Tender closed on 21 Aug 2026. Awaiting award.
Only 2 prior awards here — too little to read.
In construction, Royal United Hospitals Bath NHS Foundation Trust has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Contract opportunity for providers of outpatient pharmacy dispensing and integrated pharmaceutical healthcare services.
Opportunity to provide comprehensive outpatient pharmacy services at Royal United Hospital Bath, including medication dispensing, patient counseling, and inventory management.
Provide complete vaginal swab testing service including kits, sample transport, and result reporting for endometrial cancer screening at RUH Bath.
Mandatory NHS England clinical audit and patient outcomes programme requiring performance data collection and reporting for 2026-27.
Transport for Wales seeks temporary contingent labour providers across multiple specialisms to support infrastructure maintenance operations on the Core Valley Lines from September 2027 onwards.
Establishment and development of Longforth Farm Allotments with mandatory site preparation works and optional enhancements including car park, pathways, shed bases, and water infrastructure.
Mold Community Hospital seeks contractors for x-ray room replacement including system installation and building/mechanical/electrical works in a ground floor space with restricted access.
Deliver seven energy-efficient 4-bedroom family homes including one wheelchair-accessible unit on a constrained London infill site adjacent to Network Rail.