Balfour Beatty is seeking experienced subcontractors to design, supply, and install sheet pile walls for the Lower Thames Crossing (LTC) Roads North programme. This is a significant infrastructure opportunity involving the design and delivery of both permanent and temporary sheet pile wall systems, including cofferdams, for a major new road connecting Essex and Kent.
Key Responsibilities:
• Provide specialist input during design development with AtkinsRealis, supporting constructability, sequencing, and methodology
• Design (where applicable), manufacture, supply, and install permanent and temporary sheet pile systems
• Supply all associated components including connectors, clutches, waterproofing, and temporary works systems
• Undertake temporary works design including Approval in Principle, design calculations, and liaison with approval bodies
• Execute installation works including plant provision, supervision, and construction sequencing
• Produce quality documentation including Inspection and Test Plans, as-built records, and handover packs
• Coordinate interfaces with earthworks, drainage, structures, and the wider programme
Required Capabilities:
• Integrated design, supply, and installation solutions for sheet piling
• Early contractor involvement (ECI) input to influence design and buildability
• Expertise in complex permanent and temporary sheet piling systems
• Safe construction management including vibration, noise, and interface risk control
• Programme-aligned delivery with strong quality standards
Required Experience & Standards:
• Proven track record on major infrastructure or highways projects
• Temporary works design and management capability (or clear subcontracting model)
• Robust health, safety, environmental, and quality management systems
• Collaborative experience with Tier 1 contractors and designers
• Commitment to carbon reduction, sustainability, and social value aligned to LTC ambitions
LTC Programme Commitments:
Successful suppliers must demonstrate commitment to LTC's sustainability goals:
• Zero emissions solutions with no diesel-powered plant or machinery on site
• Local recruitment and workforce upskilling for meaningful career progression
• Early careers roles and STEM engagement to inspire young people into construction
Deadline: Respond by 28 May 2026 for pre-qualification requirements and tender timelines.