Negative Bearings Supply for London Underground S7 Lift Programme
London Underground is seeking suppliers to deliver replacement negative bearings for train bogie assemblies on three major Underground lines as part of their S7 fleet modernization programme.
Decision brief
4 fields- Contract value£1,551,699Pounds sterling
- Closing dateRollingNo closing date published
- SectorBrowse related listings
- LocationUnited KingdomLondon
Suppliers
1 supplier- SCHAEFFLER (UK) LIMITEDLead contractor
Lifecycle
AwardedContract awarded. Originally published 1 months ago.
Brief
Track record
2 awards · 2 winnersOnly 2 prior awards here — too little to read.
In construction, London Underground Limited has awarded 2 contracts to 2 suppliers.
- SCHAEFFLER (UK) LIMITED1× · 50%
- KARAS PLATING LIMITED1× · 50%
Across construction, the most active winners are SPECIALIST COMPUTER CENTRES PLC, PORTAKABIN LIMITED, CDW LIMITED — the field to beat, or your route in as a partner.
More from London Underground Limited
Supply of Vertical and Lateral Dampers for Victoria Line Fleet Heavy Overhaul
Procurement of 2,209 vertical and lateral suspension dampers valued at £559,345 for the Victoria Line fleet modernization project.
Workforce Rostering and Competency Management Software for Elizabeth Line Railway
TfL seeks a workforce rostering and competency management software solution for the Elizabeth Line to improve scheduling efficiency, ensure regulatory compliance, and optimize staff planning across the railway network.
Electrical Harnesses Supply for 1972 Bakerloo Line Tube Stock Accessibility Upgrade
Supply pre-terminated electrical harnesses for London Underground's 1972 Bakerloo Line train accessibility compliance project.
Electrical Parts Supply for 1972 Bakerloo Line Accessibility Upgrades
Supply of approved electrical parts for accessibility upgrades to London Underground's 1972 Bakerloo Line trains to meet regulatory compliance standards.
Open in Construction
72-bed vertical expansion of Block G at University Hospital Limerick
Construction contract for a three-story vertical expansion adding 72 beds to University Hospital Limerick's Block G ward, requiring work within an operational hospital campus.
Science Lab and classroom refurbishment at Stanhope Secondary School, Dublin
Secondary school refurbishment project involving two science labs and prep room at Stanhope Secondary School, Dublin 7.
Glenmore Tea Rooms Renovation and Alterations - Ireland
Convert a residential property with retail space into a café and local shop through comprehensive renovation and alterations in Ireland.
Multi-Use Games Area (MUGA) Construction for Coolaney/Mullinabreena GAA Club, Achonry, Ireland
Open tender for the complete construction of a new Multi-Use Games Area (MUGA) with synthetic surfacing, fencing, and floodlighting at a GAA club facility in Co Sligo, Ireland.