BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsPrecast Concrete Under Track Crossing Chambers and Ductwork Installation - HS2 NC2A Section
    Closed contract

    Precast Concrete Under Track Crossing Chambers and Ductwork Installation - HS2 NC2A Section

    Contract value
    £500k
    Closed 30 Jun 2026

    Specialist subcontractor required to install precast concrete Under Track Crossing chamber systems and ductwork for the HS2 NC2A project.

    🇬🇧United KingdomPublished 23 Jun 2026· 2 months agoviaContracts Finder
    Contract value
    £500k
    Closed 30 Jun 2026
    Tender deadline passed on 30 Jun 2026.

    Decision brief

    4 fields
    • Contract value
      est.£500,000
      Pounds sterling
    • Tender closed
      30 Jun 2026
      2 months ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇬🇧United Kingdom

    Lifecycle

    Closed

    Tender closed on 30 Jun 2026. Awaiting award.

    23 Jun 2026Today30 Jun 2026

    Brief

    This subcontract opportunity involves the installation of a precast concrete Under Track Crossing (UTX) chamber system as part of the North Chilterns to Aylesbury (NC2A) section of the HS2 project, managed by the EKFB Joint Venture. The successful subcontractor will be responsible for all management, labor, materials, plant, equipment, and supervision required to safely install and hand over the complete UTX system. Key responsibilities include: dewatering and edge protection of excavations; setting out and transferring precast concrete chambers from the laydown area to installation points; installing segmented precast concrete chambers and covers onto base slabs in accordance with design specifications and manufacturer's instructions; installing all associated ducting systems; placing FND4 cast-in-situ concrete around the UTX and ducts; and completing testing and handover. The Contractor will provide excavation to formation level and precast base slabs, while the Subcontractor will complete remaining excavation and all installation works to HS2 standards and local authority specifications.

    More from EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3

    4 listingsView all →
    Construction🇬🇧United Kingdom

    Subcontractor for Stair and Hard Landscaping Trial Works at Claydon Road Overbridge

    EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.

    est.£1,000,000EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Published 15 Sept 2026
    Professional Services🇬🇧United Kingdom

    HS2 C23 Project: As-Built Surveys and Design Documentation Services

    EKFB JV seeks consultants to produce as-built surveys, design documentation, and construction assurance for three delivery areas of the HS2 C23 project.

    est.£30,000,000EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Published 27 Aug 2026
    Agriculture & Food🇬🇧United Kingdom

    Waste Management Services for HS2 C23 Project

    EKFB JV is seeking waste management service providers for the HS2 C23 project through a multi-area framework procurement exercise.

    est.£1,000,000EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Published 26 Aug 2026
    Transport & Logistics🇬🇧United Kingdom

    8 Wheel Tipper Wagon Hire for HS2 Civil Engineering Project

    EKFB seeks suppliers to hire 8-wheel tipper wagons for the HS2 civil engineering project across three regional areas in support of extensive earthwork and construction activities.

    est.£1,000,000EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Published 21 Jul 2026

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Adapted Living Facilities Construction at Leaholme Crescent, Blyth

    Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.

    est.£40,000NORTHUMBERLAND COUNTY COUNCIL
    Published 15 Sept 2026
    OpenConstruction🇬🇧United Kingdom

    Barbican Arts Centre Glass and Envelope Renewal - Design and Build

    Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.

    £10,600,000indicativeTHE MAYOR AND COMMONALTY AND CITIZENS OF THE CITY OF LONDON
    Published 15 Sept 2026
    Construction🇬🇧United Kingdom

    Subcontractor for Stair and Hard Landscaping Trial Works at Claydon Road Overbridge

    EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.

    est.£1,000,000EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Published 15 Sept 2026
    Construction🇬🇧United Kingdom

    Flexipave Footpath and Dropped Kerbs Installation at Tarka Leisure Centre

    Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.

    est.£16,000North Devon District Council
    Published 15 Sept 2026
    Take action
    View on sourceContracts Finder

    Original closed notice on the publisher's site

    Publisher
    UK Cabinet Office
    Licence
    OGL v3.0
    Source
    contractsfinder.service.gov.uk
    Record ID
    183433b7-20fc-4d4b-827c-d1e515bf47bf-903202
    EK
    Buyer
    EIFFAGE KIER JV HS2 MAIN CIVILS WORKS LOTS C2 C3
    Sector
    Construction