Conduct thermophysical property testing on titanium-stabilized austenitic stainless steel grades for the Materials Testing Framework STEP - VIVS program.
Contract awarded. Originally published 2 months ago.
No single supplier dominates the field.
In engineering, UK Fusion Energy Ltd has awarded 9 contracts to 8 suppliers.
+2 more suppliers
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
Sought partner to design and integrate a multi-temperature cryogenic system delivering 65 kWth cooling capacity for the STEP Prototype Powerplant fusion energy facility.
UKFE seeks an independent assurance provider to deliver third-line assessment and oversight of permitting, licensing, and regulatory consent requirements for the STEP fusion energy programme.
Independent reviewer needed to conduct a comprehensive governance and Board Effectiveness Review for UK Fusion Energy Ltd.
Develop standardized technical specifications for fuel cycle equipment to enable supplier pre-qualification and expand the UK fusion energy supply chain.
UKAEA seeks an accredited Conformity Assessment Body and Third Party Inspection provider with global capability to perform regulatory assessments, certifications, and inspection services under UK and EU frameworks.
Sheffield City Council is procuring an integrated design team to manage the refurbishment of Sheffield Town Hall through RIBA Stages 2-7.
Home Group is seeking qualified asbestos surveying, analytical, and removal contractors through a regional framework agreement for managing its housing stock.
Develop evidence-based frameworks for assessing and improving sustainable mobility in rural areas of the Southern Region as part of the Interreg SMOOTY project.