This contract involves the renovation and reconstruction of a multi-family residential building at Bednarska 2 in Gdańsk as part of the project "Comprehensive Energy Modernization of Residential and Commercial Buildings under Conservation Protection in the City of Gdańsk from 2024 to 2027." The scop
Tender closed on 14 Jan 2026. Awaiting award.
Only 1 prior award here — too little to read.
In construction, GDASK REAL ESTATE has awarded 1 contract to 1 supplier.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves the renovation and reconstruction of a homeless shelter for men located at 1A Mostowa Street in Gdańsk. The project is part of the initiative "Modernization of Infrastructure Related to Social Policy Tasks." The scope of work includes: 1. Demolition and dismantling of damaged
The contract involves providing maintenance and repair services for residential and commercial buildings owned by the City of Gdańsk during the years 2026 and 2027. This includes emergency repairs, minor repairs, and general construction work in shared areas of residential buildings such as staircas
This contract involves the development of multi-disciplinary design and cost documentation for thermal modernization (including insulation), renovation, reconstruction, and land development for a building located at Gościnna 12 in Gdańsk. Key tasks include: 1) Preparing comprehensive design and cost
This contract involves the renovation and reconstruction of a multi-family residential building at Dolna Street 3 in Gdańsk, including the demolition of ancillary buildings and site development. The project is part of the "Comprehensive Energy Modernization of Residential and Utility Buildings in th
Opportunity to design and fitout the British Council's Penang office with reconfigured layout and new examination facilities.
Appoint a multidisciplinary design team to develop decarbonisation solutions for Historic England's national archive in Swindon through RIBA Stage 3, supporting net-zero targets by 2040.
Structural lintel replacement and lime render renewal for a heritage property in Maryport's conservation area.
Single contractor required to design and build 28 affordable homes with community facilities and football pitch in Solva, Pembrokeshire.