This framework agreement is intended to meet the needs of SNCF Réseau for conducting topographic investigations and delivering topographic outputs using mobile mapping systems, specifically 3D Topo and Dynamic Scanning. The agreement is national and not divided into lots, with detailed elements prov
Contract awarded. Originally published 5 months ago.
This contract involves the construction of a high voltage (20 kV) loop for the electrical supply system in the railway sector, specifically for the SAO Argos connection at the Le Mans junction (72). Suppliers are invited to provide services related to this construction project, which is part of the
This contract involves the main construction work for railway tracks under the project code SAO_ITECH_VOI02. The total value of the contract is approximately €2,694,278. The buyer for this project is SNCF RESEAU, and the awarded supplier is COLAS RAIL SAS. Suppliers interested in this opportunity ca
This contract involves excavation work for an electrical substation and two transformer stations. The project includes the development of the following locations: • Substation: Saint Mesmin (PK 147+670) • Transformer Station P7: Marnay sur Seine (PK 115+750) • Transformer Station P8: Maizières (PK 1
The CCR Ouest Provence Stage 1 project is part of the Centralized Network Order (CCR) deployment. It involves remote control of the main track installations in the traffic sectors between Rognac and Saint-Martin-de-Crau on the historic Paris-Lyon-Marseille line (No. 830000) from the CCR building in
Opportunity to establish and operate a collaborative Partner Testing Point facility in Iraq for quality assurance and product validation services.
Seek experienced integrated consultant team to manage design and delivery of new primary school and nursery unit in Derry/Londonderry using RIBA professional standards.
Provide independent design assurance and technical oversight for the UKHSA Health Security Campus programme, ensuring all designs meet safety, regulatory, and operational standards.
Replacement of UPS systems, busbar infrastructure, and electrical safety components to enhance operational resilience at the Colindale facility.