Skip to content
BidSonarBidSonar

Closed contract

Project Supervision and Documentation for Acoustic Barriers Construction along A1 Highway

This contract involves providing project supervision services for the design and construction of acoustic barriers along the A1 highway, specifically between the Łódź Północ and Łódź Południe junctions. The selected supplier will oversee the project in three phases: Phase I includes management and s

Published 14 Dec 2025 · 11 months agoTED

Tender deadline passed on 19 Jan 2026.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

19 Jan 2026

10 months ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Engineering

Browse related listings

Location

Poland

Publisher
Publications Office of the European Union
Record ID
829885-2025

Lifecycle

Tender closed on 19 Jan 2026. Awaiting award.

Closed
  1. Published14 Dec 202511 months ago
  2. Tender deadline19 Jan 202644 weeks ago

Brief

This contract involves providing project supervision services for the design and construction of acoustic barriers along the A1 highway, specifically between the Łódź Północ and Łódź Południe junctions. The selected supplier will oversee the project in three phases: Phase I includes management and supervision during the design period; Phase II covers management and supervision during the construction phase; and Phase III involves management and supervision during testing and measurements. In Phase III, the supervisor will verify the studies and analyses presented in the contractor's report, which includes continuous 24-hour noise level monitoring. The supervisory role includes accepting completed design work, construction tasks, and noise level studies, issuing partial acceptance protocols, and preparing settlement tables for the contractor. The supervisor will also verify and approve the main bill of quantities, project schedules, and collaborate with the investor and contractor at every stage of the project. The scope of the investment includes designing and constructing acoustic barriers, along with associated works such as dismantling existing road barriers, installing new drainage systems, and relocating road signs. Continuous noise level measurements will also be required as part of the construction work.

Track record

Thin record. Only 2 prior awards here — too little to read.

2 awards · 2 winners

In engineering, GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS has awarded 2 contracts to 2 suppliers.

Who wins here

  1. DT SA1× · 50%
  2. DTŚ S.A.1× · 50%

Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

4 listingsView all

Construction of Expressway S12 in Poland

GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

This contract involves the design and construction of the S12 expressway section from the Wieniawa junction (without junction) to the Radom Południe junction (with junction). Key tasks include: 1) Designing and constructing the expressway, including necessary engineering structures and safety device

ClosedConstructionPolandPublished 19 Feb 2026

Deadline 12 Mar 2026

Open in Engineering

4 open listingsView all