This contract opportunity involves the supply of spare parts for electrical equipment, specifically for the SOI, manufactured by ABB or equivalent. The procurement will follow the specifications outlined in Appendix No. 1 of the tender documentation. The procedure will be conducted within the framew
Contract awarded. Originally published 7 months ago.
No single supplier dominates the field.
In engineering, MARITSA EAST 2 TPP EAD has awarded 4 contracts to 4 suppliers.
Across engineering, the most active winners are DRIBO SPOL S RO, BRODOMERKUR ENERGETIKA d.o.o., BRODOMERKUR ENERGETIKA DOO — the field to beat, or your route in as a partner.
This contract involves the operation of a landfill site for solid urban waste in the 2nd Geographic Unit of Aetolia-Acarnania, specifically for the management of 12,500 tons of waste. The services required fall under the Common Procurement Vocabulary (CPV) code 90513200-8, which pertains to solid ur
This contract involves the supply of heating surfaces for PK 38-4 type boiler units, divided into two specific lots: Lot 1 - Supply of gas-tight screens for the cooling cone of the lower radiation part (DRCH) of KA-7 and KA-8 PK 38-4 type boilers, according to specifications and technical requiremen
This contract opportunity involves the supply and installation of computer equipment and accessories for the needs of the 2nd Secondary School 'Akademik Emilian Stanev'. The project is divided into three specific categories: 1. Supply of equipment and software, 2. Supply of robotic and precision equ
This contract involves the construction of a reinforced concrete surface for the widening of Runway 1, as specified in the scope of work provided by the contracting authority. The project is valued at approximately €492,063.65 and is part of the construction sector. Suppliers interested in this oppo
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.