This contract involves planning and oversight services aimed at upgrading the screening and sand trap facility in Mühlhausen. The existing facility, completed in 2005, has developed several structural and operational deficiencies. To preserve the current building and its materials, various renovatio
Tender closed on 20 Jan 2026. Awaiting award.
No single supplier dominates the field.
In engineering, AWARDING AUTHORITY STATE CAPITAL STUTTGART has awarded 3 contracts to 3 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract opportunity involves painting and coating services as part of a comprehensive interior renovation of a school building constructed in the 1960s. The work includes: - Coating 1,600 square meters of mineral substrate walls - Coating 2,200 square meters of mineral substrate ceilings - App
The City of Stuttgart is seeking suppliers for wood construction work, specifically for a two-story building with elements up to approximately 12 meters in length. The project includes the following key components: - Approximately 1,500 square meters of wooden panel walls. - Approximately 725 squa
This contract involves the installation of approximately 125 sanitary fixtures, including 1 double sewage lifting station, 1 domestic waterworks system for facade irrigation, a small compressed air system with a compressed air network, about 80 meters of stainless steel piping, approximately 2000 me
The City of Stuttgart is seeking suppliers for the provision of mobile partition wall systems. The contract includes: - One semi-automatic mobile partition wall system measuring 10,670 x 3,000 mm - One fully automatic mobile partition wall system measuring 17,350 x 3,000 mm - Three lift wall systems
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.