This contract involves the installation of a ventilation system at Klinikum Schloß Winnenden. The project includes the following key components: 1 unit of a RLT system with a KVS heat exchanger rated at 15,000 m³/h, 1 technical exhaust fan rated at 5,000 m³/h, 145 fire protection dampers with spring
Contract awarded. Originally published 5 months ago.
This contract involves the installation of heating, ventilation, and air conditioning (HVAC) systems at Klinikum Schloß Winnenden. The project includes the supply and installation of 19 radiators, 15 pump groups, approximately 2,000 meters of insulated piping for heat distribution, a distribution un
The Klinikum Schloß Winnenden is seeking suppliers for the installation of heating, ventilation, and air conditioning systems. The project includes the supply and installation of 19 radiators, 15 pump groups, approximately 2,000 meters of insulated piping for heat distribution, a distribution unit w
This contract involves the electrical installation work for a new building that will house a psychiatric outpatient clinic, day clinic, and inpatient services, as well as a movement therapy hall. The project includes general electrical systems, electrical distribution boards, lighting, emergency lig
Two-stage design and build contract to construct a new low carbon heat network heat source at Davy.
SYMCA seeks an experienced organization to extend the operational life of 25 Siemens trams through a comprehensive maintenance and upgrade program ensuring safety and reliability until 2035.
Heating control replacement works at Poplar Primary School scheduled for summer 2026, with tenders to be submitted via the London Tenders Portal.
Suppliers are invited to bid for the supply and installation of playground equipment including a multi-play frame and youth shelter at Oakley Coronation Park.