The SPL Ametarra is seeking suppliers to conduct geotechnical studies and soil analyses for current and future urban development concessions in Ajaccio. This includes projects such as COEUR DE VILLE, FINOSELLO, MEZZANA, and MISERICORDE, among others. The goal is to ensure that the soil conditions ar
Contract awarded. Originally published 11 months ago.
Only 1 prior award here — too little to read.
In engineering, SPL AMETARRA has awarded 1 contract to 1 supplier.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves the construction of a two-way access road with traffic lights on Chemin de l'Olivetto, specifically for Lots 1 and 2. Lot 1 includes roadworks and various networks, while Lot 2 focuses on signage. The project is managed by SPL Ametarra and has a total value of €191,886. Suppli
This contract involves the construction of a parking lot with 104 spaces and an urban park equipped with furniture and various play areas. The project is located on the former military site of St Joseph at the entrance of the city of Ajaccio. Suppliers are invited to provide plumbing services as par
This contract opportunity involves project management services for the removal of asbestos and the demolition of various buildings at the former Hospital of Mercy site in Ajaccio, France. Suppliers are invited to provide their expertise in architecture, construction, engineering, and inspection to e
Develop a strategic plan for deploying £50 million to decarbonise the Liverpool City Region bus fleet across five depots using zero-emission vehicles and charging infrastructure.
Engage a certified Decontamination Authorising Engineer to provide expert oversight and authorization of decontamination operations and compliance.
Theatre Royal Plymouth seeks a multi-disciplinary engineering team to support capital programme delivery for two major projects.
Welsh Government invites qualified contractors to perform a comprehensive three-dimensional topographical survey of a 170.62-hectare Baglan Bay site, with deliverables including digital ground models and CAD drawings, commencing January 2027 for three months.