This contract involves the supply of three wheel loaders for the road maintenance departments in Chotěboř, Humpolec, and Třebíč. The total value of the contract is approximately 13.6 million CZK. Suppliers interested in this opportunity should ensure they can meet the specifications and delivery tim
Tender closed on 9 Jan 2026. Awaiting award.
This contract involves the supply of 10 M1 category vehicles for the Regional Administration and Maintenance of Roads, a public organization. The vehicles are intended to support the operations of the organization in maintaining and managing road infrastructure. Suppliers are invited to submit their
This contract involves the supply of machinery for the maintenance of roadside vegetation for various road management departments under the Regional Administration and Maintenance of Roads in Vysočina, a public organization. Suppliers are invited to provide equipment that meets the needs for effecti
The contract involves the supply of 4x4, 6x4, and 6x6 trucks (N3 category) along with accessories for the regional road maintenance organization in Vysočina. Key components of this public procurement include a minimum 5-year quality warranty for the trucks (chassis for attachments), a minimum 2-year
This public procurement contract involves the repair of road III/3537 in the area of the village of Chroustov, starting at kilometer 0.463, and the repair of road III/35431 from kilometer 0.000 to the beginning of the village of Kyjov at kilometer 2.350, located in the Žďár nad Sázavou district, Vys
Procurement and installation of a fibre laser cutter to enhance manufacturing productivity and reduce costs for defence programme support.
Submit your manufacturing capabilities and expertise for components and assemblies through the Atamis RFI portal.
Seeking manufacturing SMEs to join a framework agreement for supplying components and assemblies through the Atamis portal.
Supply and installation of a factory-built Adiabatic Compressed Air Energy Storage demonstrator plant meeting specified performance requirements for delivery by June 2028, with a budget of up to £1.6 million.