Complete renovation of staff room and kitchen facilities including demolition, plumbing, electrical upgrades, glazed partitions, designer kitchen, and premium appliances.
Contract awarded. Originally published 2 months ago.
No single supplier dominates the field.
In construction, THE MAYOR AND COMMONALTY AND CITIZENS OF THE CITY OF LONDON has awarded 19 contracts to 18 suppliers.
+12 more suppliers
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
Structural engineers required to produce Stage 3 designs for the Golden Lane Estate multi-phase development project.
Consultancy and technical support needed to migrate SITS payment processing from PayPal to Flywire with full system integration.
The City Surveyor's Department seeks a real estate valuation and development software solution to manage a £4 billion portfolio of approximately 270 investment properties.
Construction of an adapted ground floor cloakroom and WC facility for a vulnerable tenant at a Blyth residential property, scheduled to begin November 2026 over 14 weeks.
Design-and-build glazed envelope and structural steelwork renewal for the Grade II listed Barbican Arts Centre, including new glazing systems, steel framing, and façade access solutions across multiple building sections.
EKFB requires a subcontractor for trial installation of access stairs and hard landscaping at Claydon Road Overbridge, with potential for future phases if successful.
Supply and install Flexipave footpath and dropped kerbs at Tarka Leisure Centre to specification.