The City of Zurich is seeking architectural services for the role of overall project manager for building-related matters, extending at least until 2040. The selected architect will review previously identified renovation measures, plan their implementation, and provide professional support during t
Contract awarded. Originally published 10 months ago.
Only 2 prior awards here — too little to read.
In engineering, CITY OF ZURICH WATER SUPPLY has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
The City of Zurich is seeking suppliers for construction work related to the technical renewal of the Hardhof groundwater facility. This project involves the creation of five new vertical filter wells using the dry drilling method, with a bore diameter of 1,200 mm and depths of up to 30 meters. Each
The City of Zurich is seeking suppliers for the installation of heating, ventilation, and air conditioning systems at Hardhof. This project involves providing the necessary equipment and services to ensure effective climate control in the specified buildings. Interested suppliers should refer to the
The project involves the complete renovation of all electrical installations for 16 slow filters divided into four buildings, as well as the renewal of the ozone system, which consists of three ozone generators. Additionally, the connections and interfaces for high and low voltage systems will be re
Ireland's Department of Agriculture seeks an accredited laboratory to analyze approximately 1,500 nematode samples annually from soil, peat, and plant materials to support national plant health controls and protect the agricultural industry.
Architectural services required for a new 3G sports dome and community facility refurbishment project in Ireland, supported by the PEACEPLUS programme, with tender submissions closing 20th November 2026.
Ireland seeks a health and safety consultancy services framework with an electronic management system for temporary traffic management, work plans, and asset documentation.
AFC Harrogate requires a professional asset condition survey to evaluate current facility and asset conditions for planning and investment purposes.