The owner intends to secure the future use standard and enhance the properties in Sondershausen by undertaking the structural renovation of the "Petersenschacht" building complex. This includes addressing existing damage to the building structure (roof/facade), foundation lines, building foundation,
Tender closed on 10 Dec 2025. Awaiting award.
No single supplier dominates the field.
In engineering, LAUSITZER UND MITTELDEUTSCHE BERGBAUVERWALTUNGSGESELLSCHAFT MBH has awarded 3 contracts to 3 suppliers.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
This contract involves professional tree inspections conducted from the ground, following the FLL tree inspection guidelines. The inspections will be carried out as a 'negative control' and documented accordingly. The areas to be inspected typically cover approximately 12,800,000 square meters and w
This contract involves conducting a comprehensive water management study aimed at developing a water network and quality that addresses conservation, mining, and water law concerns while minimizing the long-term impacts of lignite mining. The study area covers the former mining regions of Schlabendo
This contract involves the examination of post-mining lakes and surface water measurement points. The work includes navigating various sizes of post-mining lakes by boat, recording depth profiles, collecting water and plankton samples, and analyzing these samples according to MHM standards. The resu
This contract involves maintaining pH-neutral conditions in the Burghammer storage basin and ensuring compliance with water regulations for discharge into the public waterway. The project includes operating a stationary facility that mixes a neutralizing agent into the water using a submerged floati
Single-party framework contract for fire-stopping and fire-prevention services to seal structural gaps and prevent fire spread across compartments in Irish buildings.
Contractors sought to complete a 4-week mechanical, electrical, and general refurbishment upgrade of Ardglass parish church, commencing September 2026 under PEACEPLUS funding.
Secondary school construction project for science lab upgrades and building-wide insulation improvements at Glanmire Community College, Ireland.
Rehabilitation and repair project for 12 bridges on regional and local roads across water courses in County Westmeath during 2026.