BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsGermany – Construction Works for Waterways – Dredging Works for the Maintenance of Jade 01/2026 to 08/2026
    Closed contract

    Germany – Construction Works for Waterways – Dredging Works for the Maintenance of Jade 01/2026 to 08/2026

    Tender closed
    22 Dec 2025
    45 weeks ago

    The construction services to be performed involve the removal of individual shallow areas, with a maximum depth of 21.0 meters in the Jade waterway from Km 6.0 to 55.0. The execution period is from January 30, 2026, to August 31, 2026. For the hopper dredger with a calibrated hold volume of less tha

    🇩🇪GermanyPublished 24 Nov 2025· 11 months agoviaTED
    Tender closed
    22 Dec 2025
    45 weeks ago
    Tender deadline passed on 22 Dec 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      22 Dec 2025
      10 months ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Lifecycle

    Closed

    Tender closed on 22 Dec 2025. Awaiting award.

    24 Nov 2025Today22 Dec 2025

    Brief

    The construction services to be performed involve the removal of individual shallow areas, with a maximum depth of 21.0 meters in the Jade waterway from Km 6.0 to 55.0. The execution period is from January 30, 2026, to August 31, 2026. For the hopper dredger with a calibrated hold volume of less than or equal to 1200 cubic meters, two campaigns with a total hourly performance of 105 hours are planned. For the hopper dredger with a calibrated hold volume greater than 3500 to 6001 cubic meters, three campaigns with a total hourly performance of 1600 hours are planned. For the water injection device, four campaigns with a total hourly performance of 700 hours are planned. The material to be dredged consists of material driven into the fairway (mobile soils). The bulk density of the driven material is predominantly 'loose'. The composition of the driven soils in the various dredging sections may vary throughout the year. Based on soil investigations, the driven areas in the dredging focal points range from 7.5 to 10.5 and from km 39.0 to 43.0 in homogeneous areas of gravel-clay or silt, with a gravel content of less than or equal to 30 percent; fine grain content equal to or greater than 15 percent. Although no shell or shell fragments were found in the soil samples, a shell content of less than or equal to 5% is to be expected.

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Demolition and Clearance Services for Redoubt Court Properties

    Demolition and full clearance services required for two residential properties at Redoubt Court in Fareham.

    Fareham Borough Council
    Published 30 Oct 2026
    Construction🇬🇧United Kingdom

    Bridge Bearings Supply and Installation for Lower Thames Crossing Roads North

    Balfour Beatty seeks experienced bridge bearing suppliers for design support and installation across 16 structures on the Lower Thames Crossing Roads North project, with applications due 13 November 2026.

    est.£500,000Balfour Beatty Civil Engineering
    Published 30 Oct 2026
    Construction🇬🇧United Kingdom

    Communal Doors and Door Entry Systems Framework

    PfH is recruiting manufacturers and contractors to supply and install communal doors and entry systems across a 2+1+1 year framework agreement serving social housing providers.

    est.£80,000,000PROCUREMENT FOR HOUSING
    Published 30 Oct 2026
    Construction🇬🇧United Kingdom

    Structural and Damp Proofing Works Framework - Stoke-on-Trent

    Stoke-on-Trent City Council is appointing up to two contractors to a framework agreement for structural repairs and damp proofing services on council properties.

    est.£360,000Stoke on Trent City Council
    Published 30 Oct 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    781795-2025

    Your fit

    Could you win the next one?

    This one has closed. Sonar reads WATERWAYS AND SHIPPING OFFICE WESER JADE NORTH SEA's work like this against your business and sends the next one that fits, every Monday.

    Check my fit

    Free · Matches every Monday

    WS
    Buyer
    WATERWAYS AND SHIPPING OFFICE WESER JADE NORTH SEA
    Sector
    Construction