The construction services to be performed involve the removal of individual shallow areas, with a maximum depth of 21.0 meters in the Jade waterway from Km 6.0 to 55.0. The execution period is from January 30, 2026, to August 31, 2026. For the hopper dredger with a calibrated hold volume of less tha
Tender closed on 22 Dec 2025. Awaiting award.
Karbon Homes is seeking a contractor to provide disabled home adaptations and aids services across the North East of England for residents in private and tenanted properties.
Contractor required for expansion works at Farnham and Ash Secondary School to increase school capacity.
Contractor needed for expansion construction works at Hoe Valley 1FE School.
Contractor needed for Bishop Wand School construction works expansion in Spelthorne.