BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesBrandPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsGermany – Water Construction Works – Restoration of the Banks of the North-East Canal, BA 2 in the Canal Area from Kkm 5 to 75
    Closed contract

    Germany – Water Construction Works – Restoration of the Banks of the North-East Canal, BA 2 in the Canal Area from Kkm 5 to 75

    Tender closed
    9 Dec 2025
    47 weeks ago

    This contract involves the restoration of the underwater slope profile in approximately 51 damaged bank areas of varying lengths between canal kilometers 5 (Averlak / Kudensee) and 75 (Sehestedt) on both sides of the NOK. The work includes the delivery and installation of 24,000 tons of water constr

    🇩🇪GermanyPublished 20 Nov 2025· 11 months agoviaTED
    Tender closed
    9 Dec 2025
    47 weeks ago
    Tender deadline passed on 9 Dec 2025.

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Tender closed
      9 Dec 2025
      11 months ago
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Lifecycle

    Closed

    Tender closed on 9 Dec 2025. Awaiting award.

    20 Nov 2025Today9 Dec 2025

    Brief

    This contract involves the restoration of the underwater slope profile in approximately 51 damaged bank areas of varying lengths between canal kilometers 5 (Averlak / Kudensee) and 75 (Sehestedt) on both sides of the NOK. The work includes the delivery and installation of 24,000 tons of water construction stones (natural stone, LMB 60) to create a riprap wall to secure the upper bank area during excavation (Construction Phase 1), excavation of demolition edges and overhangs including profiling according to the target profile (Construction Phase 2), delivery and installation of 60,000 tons of sand-gravel mixture (filter stage 1 according to BAW recommendation) to fill soil deficiencies (Construction Phase 3), delivery and installation of 35,000 tons of gravel-stone mixture (filter stage 2 according to BAW recommendation) for covering and erosion protection of filter stage 1 (Construction Phase 4), delivery and installation of 80,000 tons of natural stone with high stability for filling extensive deficiencies primarily of priority II (Construction Phase 4), delivery and installation of 23,000 tons of water construction stones (natural stone, LMB 60) to secure and cover the filling areas in case of priority I damages (Construction Phase 5), installation of 1,000 m² of bank protection mats for erosion protection of non-load-bearing soils, as well as excavation and profiling of excess soil on the underwater slope, including success control of all work steps via surveying plans.

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Third-Party Crane Services Framework

    KBS Maritime seeks multiple crane service suppliers to provide surge capacity, specialized lifting, and operative support for maritime operations.

    est.£4,000,000KBS MARITIME LTD
    Published 5 Nov 2026
    Construction🇬🇧United Kingdom

    Plumbing Preventative Maintenance and Reactive Repairs for Hertfordshire Police

    Hertfordshire Police requires plumbing preventative maintenance and reactive repair services for their facilities.

    est.£371,500THE POLICE AND CRIME COMMISSIONER FOR HERTFORDSHIRE
    Published 5 Nov 2026
    OpenConstruction🇬🇧United Kingdom

    Construction of Link Corridor and Associated Works at Boston Leisure Centre

    Boston Borough Council is inviting construction contractors to bid on a link corridor extension and leisure centre improvements at Geoff Moulder Leisure Centre in Boston.

    Boston Borough Council
    Published 5 Nov 2026
    Construction🇬🇧United Kingdom

    Track Repairs for Three Local Allotments

    Supply and install track repairs at three local allotment sites: Brockhurst, Manor Way, and Middlecroft.

    est.£65,000Gosport Borough Council
    Published 5 Nov 2026
    Take action
    View on sourceTED

    Original closed notice on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    773418-2025

    Your fit

    Could you win the next one?

    This one has closed. Sonar reads WATERWAYS AND SHIPPING OFFICE NORTHEAST CANAL's work like this against your business and sends the next one that fits, every Monday.

    Check my fit

    Free · Matches every Monday

    WS
    Buyer
    WATERWAYS AND SHIPPING OFFICE NORTHEAST CANAL
    Sector
    Construction