This contract opportunity involves the delivery of four three-axle trucks equipped with a hook lift and a crane. The buyer is Die Autobahn GmbH des Bundes - NL Nordost, and the deadline for submissions is November 28, 2025. Suppliers interested in this opportunity should refer to the provided link f
Tender closed on 28 Nov 2025. Awaiting award.
This contract opportunity involves construction work on the A2 highway, specifically between kilometers 38 and 44. The project focuses on the installation of road markings and signage for both directions of traffic. Suppliers are invited to submit proposals for these services. The deadline for submi
The A13 maintenance project involves work on the highway section from km 27.950 to 36.401. This contract includes several engineering services: Lot 1 focuses on local construction supervision for a traffic warning system and traffic safety measures; Lot 2 covers road construction and bridge renovati
This contract involves engineering services for the local supervision of construction work on the A9 highway, specifically between kilometers 24.654 and 44.870, heading towards Berlin. The project includes two phases: the first phase will renew the section from km 33.900 to km 44.870 in 2026, and th
This contract opportunity involves construction work on the A24 highway in Germany, specifically between kilometers 158 and 166 on the left direction lane. The project includes traffic safety measures as part of the work. Suppliers are invited to submit bids for this construction project, which is m
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.