This contract involves the expansion of workshop infrastructure in Landquart, specifically focusing on the installation of crane systems (BKP 364) as part of Lot 3. The project is managed by Rhätische Bahn AG and has a total value of approximately 612,986.45 CHF. Suppliers interested in this opportu
Contract awarded. Originally published 10 months ago.
No single supplier dominates the field.
In construction, RHAETIAN RAILWAY LTD has awarded 4 contracts to 4 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract involves construction work in Thusis, Switzerland, specifically focusing on the renewal of the upper structure and platform adjustments. The project is managed by Rhätische Bahn AG and has a total value of approximately 2,180,510.90 CHF. Suppliers are invited to review the tender docum
This project involves the complete renewal of the track and railway facilities, including the construction of two accessible platforms (each 300 meters long) connected by an underpass with covered stair and ramp access. The siding will be relocated and newly connected from the Filisur side. The trac
This contract opportunity involves the expansion of workshop infrastructure in Landquart, specifically focusing on ceiling insulation work (BKP 211). Suppliers are invited to provide their proposals for this construction project. For more details, please refer to the attached documents.
Supply and install engineered water break tanks at two locations including design, procurement, and installation services.
Nottingham City Council invites bids for the £5.56 million development of a former church into social housing in Clifton.
Weston-super-Mare Town Council seeks experienced contractors to rebuild a collapsed £75,000 stone retaining wall at Milton Road Cemetery, with Expression of Interest submissions due by 6 November 2026.
Design and construct a fully equipped public toilet block at Rendlesham Forest, Suffolk, for completion by March 2027.