The Profilschule, along with the cafeteria, sports hall, and sports facilities, forms the school center. It was built between 1963 and 1971, has been expanded multiple times, and was used for a long time by a secondary school. With the closure of the secondary school on July 31, 2016, the new school
Contract awarded. Originally published 9 months ago.
No single supplier dominates the field.
In construction, ASCHEBERG MUNICIPALITY has awarded 3 contracts to 3 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, LINDUM GROUP LIMITED, TARMAC TRADING LIMITED — the field to beat, or your route in as a partner.
The Profilschule, along with the cafeteria and sports hall, forms the school center. It was built between 1963 and 1971, has been expanded multiple times, and was previously used by a secondary school. With the closure of the secondary school on July 31, 2016, the new school format (Profilschule) is
The Profilschule, along with the cafeteria and sports hall, forms the school center. It was built between 1963 and 1971, has been expanded multiple times, and was previously used by a secondary school. With the closure of the secondary school on July 31, 2016, the new school format (Profilschule) is
The Profilschule, along with the cafeteria and sports hall, forms the school center. It was built between 1963 and 1971, has been expanded multiple times, and was previously used by a secondary school. With the closure of the secondary school on July 31, 2016, the new school form (Profilschule) is n
Supply, installation, and servicing of navigation buoys and associated marine equipment in Donegal Bay, including removal of existing systems and deployment of new 1.2-meter diameter buoys.
Refurbishment and repair services required for sash windows at the Moyderwell building in Tralee, County Kerry.
Padstow Town Council invites expressions of interest from contractors for refurbishment of Community Hub roof and two toilet blocks, plus construction of new toilet facilities at Lawn's car park, with works scheduled for Q4 2026.
Refurbishment and single storey extension project for a residential home located on Rosary Road in Oldham.