This contract involves the construction of a two-story school building for the Heilsbronn secondary school, including flooring and floor covering work. The project requires the use of reinforced concrete with a total volume of 19,924.28 m³ and a gross floor area of 4,981.15 m². Suppliers are invited
Contract awarded. Originally published 12 months ago.
Only 1 prior award here — too little to read.
In construction, FLIESEN GRNER GMBH has awarded 1 contract to 1 supplier.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Contract opportunity for access improvement, landscaping, and drainage works at Acle Bridge toilet block.
KBS Maritime seeks multiple crane service suppliers to provide surge capacity, specialized lifting, and operative support for maritime operations.
Hertfordshire Police requires plumbing preventative maintenance and reactive repair services for their facilities.
Boston Borough Council is inviting construction contractors to bid on a link corridor extension and leisure centre improvements at Geoff Moulder Leisure Centre in Boston.