The Augusta Hospital in Bochum is planning to construct a new three-story building with a flat roof on its property located at Bergstraße. This building will have 72 beds and will include a connecting bridge to the existing hospital. The construction site is situated at the northeastern edge of the
Tender closed on 8 Dec 2025. Awaiting award.
Merseytravel invites licensed asbestos contractors to remove AIB cladding panels and associated materials from the Kingsway Tunnel, including decontamination and cleaning.
KCHFT seeks specialist boiler and mechanical contractors for planned remedial works, replacements, and installations across its South East estate on an activity-based contract.
Main Contractor needed to complete fit-out works for a new Apollo Mission Simulator Gallery space.
Design, manufacture, install, and commission a replacement vertical lifting platform for Bonington Gallery.