This contract involves the design and construction of various roadworks for National Road No. 15, specifically the section between Tywola and Brodnica - Tama Brodzka. The contractor will be responsible for a wide range of tasks, including: 1) expanding National Road No. 15, 2) reconstructing existin

Published 2 Nov 2025 · 1 year agoTED

Tender deadline passed on 8 Dec 2025.

View on sourceTED

Original closed notice on the publisher's site

Tender closed

8 Dec 2025

11 months ago

Contract value

Not disclosed

Source did not declare a figure

Sector

Construction

Browse related listings

Location

Poland

Publisher
Publications Office of the European Union
Record ID
725592-2025

Lifecycle

Tender closed on 8 Dec 2025. Awaiting award.

Closed
  1. Published2 Nov 20251 year ago
  2. Tender deadline8 Dec 202550 weeks ago

Brief

This contract involves the design and construction of various roadworks for National Road No. 15, specifically the section between Tywola and Brodnica - Tama Brodzka. The contractor will be responsible for a wide range of tasks, including: 1) expanding National Road No. 15, 2) reconstructing existing roads that conflict with the national road, 3) building roads other than the national road to restore disrupted connections or provide access to properties, 4) constructing additional lanes within the national road corridor, 5) building or reconstructing pedestrian and cyclist infrastructure, 6) creating access points to the national road or additional lanes, 7) constructing wildlife crossings, 8) implementing drainage systems, including road ditches and stormwater management, 9) installing environmental protection measures, such as noise barriers and wildlife crossings, 10) removing and disposing of invasive plant species from the construction site, 11) managing and disposing of identified waste, 12) reconstructing water supply and sewage networks, 13) reconstructing conflicting utilities and networks, 14) demolishing road elements and structures, 15) creating a technology channel, 16) installing road lighting, 17) setting up traffic signals, 18) organizing traffic, including safety devices, 19) cleaning and maintaining existing drainage systems, 20) restoring areas used for construction back to their original state, 21) repairing roads and properties affected by construction activities, 22) establishing boundaries for constructed roads, 23) connecting the new section to the existing road network, 24) strengthening the ground and ensuring stability of excavations and embankments, 25) reconstructing external connections for buildings affected by property division, 26) demolishing existing road structures as per detailed requirements, 27) preparing a project for the transfer of non-national roads to their future managers, 28) planting greenery and managing tree and shrub removal. Note: This is a summary description; the full details are in the procurement documents. The estimated value of the contract is between 5,538,000.00 and 20,000,000.00 Euros. The contracting authority requires the contractor to personally perform key tasks, specifically the surfacing of National Road No. 15 with mineral-asphalt mixtures.

Track record

Open field. No single supplier dominates the field.

9 awards · 9 winners

In construction, GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS has awarded 9 contracts to 9 suppliers.

Who wins here

+3 more suppliers

Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.

Ask an assistant

Add BidSonar to the assistant you already use, then ask it about this notice in plain English.

More from GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

4 listingsView all

Construction of Expressway S12 in Poland

GENERAL DIRECTORATE FOR NATIONAL ROADS AND MOTORWAYS

This contract involves the design and construction of the S12 expressway section from the Wieniawa junction (without junction) to the Radom Południe junction (with junction). Key tasks include: 1) Designing and constructing the expressway, including necessary engineering structures and safety device

ClosedConstructionPolandPublished 19 Feb 2026

Deadline 12 Mar 2026

Open in Construction

4 open listingsView all