Closed contract

Architectural Design Services for Construction of CCGT Power Plants

Tender closed
24 Nov 2025
36 weeks ago

This contract involves the architectural design services required for the construction of two combined cycle gas turbine (CCGT) power plants with a capacity of 530 to 680 megawatts electric (MWe). The buyer, Enea Elektrownia Połaniec Spółka Akcyjna, is seeking qualified suppliers to provide comprehe

PolandPublished 23 Oct 2025· 9 months agoTED
Tender deadline passed on 24 Nov 2025.

Decision brief

4 fields
  • Contract value
    Not disclosed
    Source did not declare a figure
  • Tender closed
    24 Nov 2025
    8 months ago
  • Sector
    Browse related listings
  • Location
    Poland

Lifecycle

Closed

Tender closed on 24 Nov 2025. Awaiting award.

23 Oct 2025Today24 Nov 2025

Brief

This contract involves the architectural design services required for the construction of two combined cycle gas turbine (CCGT) power plants with a capacity of 530 to 680 megawatts electric (MWe). The buyer, Enea Elektrownia Połaniec Spółka Akcyjna, is seeking qualified suppliers to provide comprehensive design services that will meet the specifications and requirements for this significant energy project. Interested suppliers should review the details and submit their proposals by the deadline.

More from ENEA POANIEC POWER PLANT JOINT STOCK COMPANY

4 listingsView all →
Facilities ManagementPoland

Fire Alarm System Maintenance and Repair Services

Enea Elektrownia Połaniec S.A. is seeking suppliers for maintenance and repair services related to control systems, safety devices, and automation of equipment and installations over a period of 32 months. This contract specifically focuses on the technical review of fire alarm systems. Interested s

ENEA POANIEC POWER PLANT JOINT STOCK COMPANY
Published 1 Mar 2026
Facilities ManagementPoland

Fire Safety Services for Enea Elektrownia Połaniec

Enea Elektrownia Połaniec S.A. is seeking suppliers to provide comprehensive fire safety services. This includes the repair and maintenance of fire-fighting equipment, as well as the operational and maintenance activities related to fire protection systems and installations. The goal is to ensure th

ENEA POANIEC POWER PLANT JOINT STOCK COMPANY
Published 15 Dec 2025
Facilities ManagementPoland

Fire Safety Services for Enea Elektrownia Połaniec

Enea Elektrownia Połaniec S.A. is seeking suppliers to provide comprehensive fire safety services. This includes the repair and maintenance of fire-fighting equipment, as well as the operational and maintenance activities related to fire protection systems and installations. The goal is to ensure th

ENEA POANIEC POWER PLANT JOINT STOCK COMPANY
Published 2 Dec 2025
EngineeringPoland

Architectural Design Services for Construction of CCGT Power Plants

This contract involves the architectural design services required for the construction of two combined cycle gas turbine (CCGT) power plants with a capacity of 530 to 680 megawatts electric (MWe). Suppliers are invited to submit proposals for the design work, which is essential for the successful ex

ENEA POANIEC POWER PLANT JOINT STOCK COMPANY
Published 23 Nov 2025

Open in Engineering

4 open listingsView all →