This project involves the construction of essential works to protect residents and their properties near the banks of the two streams, Baxina and Basdeki, from flooding. It also aims to prevent erosion or sedimentation of their beds caused by natural or human factors. The proposed works include: • C
Tender closed on 28 Nov 2025. Awaiting award.
Supply and installation of heating and hot water mechanical equipment including boilers, pumps, and controls at CHI Temple Street.
Opportunity to supply flooring services and maintenance across multiple NHS hospital sites in South Tyneside and Sunderland under a measured term contract.
SPS seeks a contractor to design, build, and install modular prison cell accommodation at HMP Castle Huntly through the GCA Offsite Construction Solutions Framework.
UKAEA seeks suppliers and manufacturers to provide an activation foil retrieval system for the LIBRTI research facility.