This is a framework agreement for the supply of 40% Ferric Chloride Solution in accordance with EN 888 standards for the Ruhleben wastewater treatment plant. The Berliner Wasserbetriebe is seeking suppliers who can provide this chemical product, which is essential for water treatment processes. The
Tender closed on 4 Nov 2025. Awaiting award.
Mostly framework call-offs rather than head-to-head competition.
In manufacturing, BERLIN WATER WORKS has awarded 2 contracts to 2 suppliers.
Across manufacturing, the most active winners are BOC LIMITED, KEMIPOL SP Z OO, KEMIPOL SP Z O O — the field to beat, or your route in as a partner.
This contract involves the purchase of eleven 5.0-ton delivery trucks with single cabins and high roofs, along with an option for an additional vehicle. The contract includes delivery of the trucks, but does not cover registration. Suppliers are invited to submit their bids for this procurement oppo
This framework agreement aims to provide cleaning and maintenance services for pipes, tanks, and containers at the service locations listed in the attached service specification for Berliner Wasserbetriebe (Public Law Institution). The scope of work includes pipe cleaning and tank/container emptying
This contract is for a framework agreement to provide service, repair, and maintenance for water-related specialized vehicles operated by Berliner Wasserbetriebe (BWB). The total value of the contract is €535,000. Suppliers are invited to submit proposals for the maintenance and repair of these vehi
This contract opportunity involves the renewal of drinking water pipelines, wastewater pressure pipelines, and drainage systems. Suppliers are invited to submit proposals for construction services related to these essential infrastructure upgrades. The work aims to improve the quality and reliabilit
Supply and installation of a complete CNC fibre tube laser cutting system with training and support for high-volume structural and tubular steel fabrication.
Roscommon Coaches Ltd requires a three-brush vehicle washing system with rainwater harvesting capability for cleaning buses, trucks, and vans.
Southern Water is tendering a major DBFOM contract to design, build, finance, maintain and operate a new water recycling and transfer system supplying 42 km of infrastructure to address Hampshire's water supply shortfall.
Framework agreement opportunity for suppliers of comprehensive fire safety products and services including active/passive protection systems, risk assessments, training, and equipment maintenance.