This public procurement contract involves the design and execution of works for the rehabilitation of the county road DJ 186, which stretches 13.322 km from km 0+000 to km 13+322, passing through the localities of Vadu Izei, Oncești, and Bârsana. The project aims to improve the road infrastructure i
Contract awarded. Originally published 1 year ago.
Only 2 prior awards here — too little to read.
In construction, MARAMURE COUNTY MARAMURE COUNTY COUNCIL has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
The project aims to equip the integrated outpatient clinic of the Baia Mare Infectious Diseases and Psychiatry Hospital with necessary medical equipment and furniture. The contractor is required to supply various medical devices and furniture across multiple lots, including: - **Lot 1: Medical Equi
This contract opportunity involves the supply of various equipment aimed at enhancing traffic safety in Maramureș County. The project includes the following lots: - **Lot 1**: 12 snow plow blades (3,200 mm each) - **Lot 2**: 12 anti-skid material distributors (8 m³ each) - **Lot 3**: 1 road mark
This contract opportunity involves the supply of equipment aimed at enhancing traffic safety in Maramureș County. The specific requirements include: 4 multifunctional vehicles with 7 attachments each, equipped with a lateral multifunctional arm, snow blade, solid anti-skid material spreader, front s
Design and construction contract for landslip repair works including retaining wall, road reconstruction, and earthworks at Chesterfield Road, Beeley, Derbyshire.
Kirklees Council is seeking construction contractors and subcontractors via a Dynamic Purchasing System framework worth £154 million for repair and maintenance services.
FCDO is conducting preliminary market engagement for a 998 sqm office fit-out project at the new Deputy High Commission in Mumbai, targeting award in April 2027 and completion in February 2028.
Complete refurbishment of two hospital WC facilities and ground-floor corridor flooring, including sanitaryware replacement, safety flooring installation and all associated mechanical, electrical and plumbing works.