The Schwimmerbund BAYERN 07 association is renovating the existing outdoor swimming pool at Pulversee 1 in Nuremberg. In March 2026, the demolition of the existing supervision and technical building (approximately 650 m³) will begin, along with partial demolition of the two large pools. The entrance