This contract involves the reconstruction of the external reception installation at GWC Mościckiego 14 in Sosnowiec as part of the TERMIC Project (TAURON Efficiency, Development, Modernization of Heating Infrastructure). The work must be carried out according to the project documentation, and the co
Tender closed on 17 Nov 2025. Awaiting award.
This contract involves the ongoing supply of limestone sorbent to TAURON Ciepło sp. z o.o. The estimated quantities required are as follows: 1) Granulated limestone sorbent with a size of 0.1-0.4mm: a) 5,800 Mg for the EC1 Power Plant in Bielsko-Biała (with a possibility of directing up to 15% of de
This contract involves the construction work for the reconstruction of a high-parameter heating network between chamber 1273C9 and chamber 1273C10 (1276C10) in the area of Kopernika Street, Dąbrowa Górnicza. The work will be carried out based on the provided project documentation, and the completed
This contract opportunity involves providing rail transport services for coal to various power plants operated by TAURON Ciepło sp. z o.o. Suppliers will be responsible for transporting coal using their own rail vehicles along the lines of PKP Polskie Linie Kolejowe S.A. or other infrastructure mana
This contract involves the ongoing repair of the BFB boiler at the Tychy Heat and Power Plant. The work includes inspections and necessary repairs of malfunctioning, damaged, or worn-out equipment and components in water and steam installations. Additionally, it involves cleaning the bottom of the n
Refurbishment of external pedestrian pathways at St Helier Hospital Main Building with safety improvements, drainage work, and accessibility enhancements, delivered in phases within a live hospital environment.
Construction project to adapt an existing dwelling in County Kerry, Ireland for improved accessibility with associated site and ancillary works.
Emergency refurbishment and accessibility compliance works at Heywood Community School in Ireland, scheduled for 2026.
Construction project to build 2 new SEN classrooms and associated facilities including soft play area and landscaping at a primary school in Trim, Ireland.