BidSonarBidSonar
ContractsGrantsOrganisationsSectors
BidSonarBidSonar·Built by Hypership
SourcesPrivacyTermsCookies

BidSonar is an independent index of public-sector opportunities. We aggregate data from official sources and are not affiliated with any procurement body. Data is licensed under the Open Government Licence v3.0 and the EU TED reuse notice.

    ContractsConstruction Work at Former Ford Site in Saarlouis
    Awarded contract

    Construction Work at Former Ford Site in Saarlouis

    Status
    Awarded
    Published 29 Sept 2025

    Ford will cease production of the FOCUS at its Saarlouis plant by November 2025. Approximately 1,000 jobs will remain on-site until around 2032. The site includes the main plant and the Ford Industrial Supplier Park (FISP). The plant will gradually reduce its area to a section called 'Ford 1000'. To

    🇩🇪GermanyPublished 29 Sept 2025· 10 months agoviaTED
    Status
    Awarded
    Published 29 Sept 2025

    Decision brief

    4 fields
    • Contract value
      Not disclosed
      Source did not declare a figure
    • Closing date
      Rolling
      No closing date published
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Suppliers

    1 supplier
    • BB
      BACKES BAUUNTERNEHMUNG AG CO KG
    Lead contractor

    Lifecycle

    Awarded

    Contract awarded. Originally published 10 months ago.

    29 September 2025
    Awarded — no open tender advertised

    Brief

    Ford will cease production of the FOCUS at its Saarlouis plant by November 2025. Approximately 1,000 jobs will remain on-site until around 2032. The site includes the main plant and the Ford Industrial Supplier Park (FISP). The plant will gradually reduce its area to a section called 'Ford 1000'. To prepare the released areas for the Ravensburg pharmaceutical company Vetter, a phased demolition of the site and its infrastructure is necessary. This demolition will start at the Winter Staging Area (WSP) and the subcontractor area (Lot 1), followed by the 'Compound' area (Lots 2 & 3), and finally the production area 'Assembly' along with a new access road, the 'Saarland Corridor', as additional lots. This specific project, part of the overall Saarlouis Roden industrial area (ISR), is referred to as 'Compound Area, Demolition of Areas Lot 3: Provision of Construction Services'. The work includes removing surface layers and underlying support layers (HO gravel), storing them on designated areas, and reusing suitable materials after proper processing. Existing infrastructure (channels, water pipes, separators, etc.) must be properly decommissioned and demolished to a depth of 1.00 m below the ground surface if no longer needed. The Compound consists of two areas: Compound North (Component 1A) and Compound South (Component 1B). During the demolition, the buildings in the Compound area will also be dismantled. Contractors for Lots 2 and 3 must coordinate to ensure a smooth construction process. Further details can be found in Section II.1.23.

    Track record

    1 award · 1 winner
    Thin record

    Only 1 prior award here — too little to read.

    In construction, GWSAAR SOCIETY FOR ECONOMIC DEVELOPMENT SAAR LTD has awarded 1 contract to 1 supplier.

    Who wins here
    1. BACKES BAUUNTERNEHMUNG AG CO KG1× · 100%

    Across construction, the most active winners are HOLCIM UK LIMITED, LINDUM GROUP LIMITED, TARMAC TRADING LIMITED — the field to beat, or your route in as a partner.

    Open in Construction

    4 open listingsView all →
    Construction🇮🇪Ireland

    Marine Navigation Aids Services for Donegal Bay

    Supply, installation, and servicing of navigation buoys and associated marine equipment in Donegal Bay, including removal of existing systems and deployment of new 1.2-meter diameter buoys.

    Donegal County Council
    Published 21 Aug 2026
    Construction🇮🇪Ireland

    Sash Window Refurbishment and Repair - Moyderwell Building, Tralee

    Refurbishment and repair services required for sash windows at the Moyderwell building in Tralee, County Kerry.

    est.€200,000KERRY EDUCATION AND TRAINING BOARD
    Published 21 Aug 2026
    OpenConstruction🇬🇧United Kingdom

    Community Hub and Toilet Facilities Refurbishment and Construction Project

    Padstow Town Council invites expressions of interest from contractors for refurbishment of Community Hub roof and two toilet blocks, plus construction of new toilet facilities at Lawn's car park, with works scheduled for Q4 2026.

    PADSTOW TOWN COUNCIL
    Published 21 Aug 2026
    Construction🇬🇧United Kingdom

    Rosary Road Home Refurbishment and Extension in Oldham

    Refurbishment and single storey extension project for a residential home located on Rosary Road in Oldham.

    est.£250,000Oldham Metropolitan Borough Council
    Published 21 Aug 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    637570-2025
    GS
    Buyer
    GWSAAR SOCIETY FOR ECONOMIC DEVELOPMENT SAAR LTD
    Sector
    Construction