Develop and demonstrate manufacturing processes for palladium-silver hydrogen separation membranes, including annealing, brazing, and diffusion bonding with full material characterization and testing.
Tender closed on 29 Jun 2026. Awaiting award.
Only 1 prior award here — too little to read.
In engineering, UK Fusion Energy Ltd has awarded 1 contract to 1 supplier.
Across engineering, the most active winners are AECOM LTD, WSP UK LIMITED, OVE ARUP PARTNERS LIMITED — the field to beat, or your route in as a partner.
Conduct an independent interim socio-economic evaluation of the UK STEP fusion energy programme to support accountability, learning, and future investment decisions.
Design a solid-oxide electrolyser system for processing tritiated water in the STEP fusion reactor's fuel cycle across three progressive phases.
UKFE is procuring an Intelligent Client support supplier to manage permitting, licensing, and regulatory assurance activities for the STEP Prototype Powerplant project over 24 months, with optional extension.
Develop and deliver an intensive leadership training programme combining online orientation and a 2-day residential workshop for 15 UK finance executives.
Establish a strategic partnership framework with 2 suppliers to deliver specialized expertise, independent assurance, and innovation in support of major programmes and operational excellence.
Arboricultural survey needed at Woodside Day Centre on White Hart Lane to assess tree health, safety, and maintenance requirements.
Conduct an arboricultural survey to evaluate trees and vegetation at Queen Street/Bull Lane Playing Field in N17 as part of the London Construction Programme.
Professional services required to deliver a 13-month integrated catchment management and community engagement project combining environmental assessments, education, citizen science monitoring, and habitat restoration in Carndonagh, Co. Donegal.