This contract involves the supply of 105 electric motors to Jastrzębska Spółka Węglowa S.A. (JSW S.A.) for use in their mining operations. The delivery is expected to be completed within 12 months from the contract signing date. Suppliers should refer to the technical specifications document attache
Contract awarded. Originally published 1 year ago.
Only 2 prior awards here — too little to read.
In engineering, JASTRZBSKA COAL COMPANY SA BASED IN JASTRZBIEZDRJ PRODUCTION SUPPORT DEPARTMENT has awarded 2 contracts to 2 suppliers.
Across engineering, the most active winners are BRODOMERKUR ENERGETIKA d.o.o., BRODOMERKUR ENERGETIKA DOO, SUNBELT RENTALS LIMITED — the field to beat, or your route in as a partner.
This contract opportunity involves the supply of stone-lime powders to JSW S.A. mines in Poland. The contract is set for a duration of 12 months from the date of signing. Suppliers are required to refer to the technical specifications outlined in Annex 1 of the procurement documents for detailed req
This contract opportunity involves the supply of high-pressure, fire-resistant, and anti-static hydraulic hoses with two and four braids (types 2SN, 2ST, 4SP, and 4SH) for JSW S.A. mines. The contract has a duration of 12 months from the date of signing. Detailed specifications are provided in the t
This contract opportunity involves the supply of cables, wires, and similar products specifically for the delivery of conveyor belt sewing connectors to JSW S.A. mines. The work is expected to be completed within 12 months from the contract signing date. Detailed specifications are provided in the t
This contract involves the supply of lifting and handling equipment, specifically drums and drum assemblies for conveyor belts, to Jastrzębska Spółka Węglowa S.A. The delivery is expected to be completed within 12 months from the date of contract signing. Suppliers should refer to the technical spec
Guildford Borough Council seeks a contractor to design, supply, install, and commission a roof-mounted solar PV system at The Enterprise Centre, Farnham, as part of its renewable energy and carbon reduction initiative.
Install a 99kW ballast-mounted solar panel system on the West Ham shop roof with inverters and connection to the Stadium electrical network.
Hounslow Council seeks a Strategic Energy Partner to develop and deliver a £500m+ energy infrastructure pipeline supporting borough decarbonisation and net zero goals.
Hounslow Council is seeking a Heat Network Development Partner to design, finance and operate a borough-wide district heating network serving 484 GWh of annual demand, with procurement launching Spring 2027 and £10.55m in government grant funding secured.