The City of Rzeszów is seeking suppliers for two main items: 1) A containerized water treatment station designed for the periodic or permanent treatment of surface or groundwater, especially in crisis situations. The station should have a minimum capacity of 60/90 m3/h (1300/2000 m3/d) and be capabl
Tender closed on 20 Oct 2025. Awaiting award.
The contract involves providing street cleaning and maintenance services in Rzeszów, Poland. The selected supplier will be responsible for the following tasks: 1) Mechanical cleaning of roadways (227,000 ares) 2) Mechanical cleaning of sidewalks (47,000 ares) and parking areas 3) Manual cleaning of
The contract involves maintaining green spaces in parks and green areas within the administrative boundaries of the City of Rzeszów. The contractor will perform the following tasks: 1) mowing lawns, collecting waste, and caring for plantings over an area of up to 800 hectares, 2) cutting and perform
The contract involves the collection and management of municipal waste in the City of Rzeszów. This includes waste from residential and mixed-use properties. Key responsibilities include: 1) Collecting and managing approximately 70,300 tons of municipal waste annually, 2) Organizing and operating at
This contract involves providing cleaning services for public transport facilities managed by ZTM in Rzeszów. The work includes maintaining cleanliness at bus stops and bicycle facilities. Key tasks include collecting litter from all areas of the bus stops and bicycle facilities, sweeping the surfac
Suppliers are invited to bid for a three-year green electricity supply contract serving multiple public bodies from April 2027 to March 2030.
Supply mains gas to 18 meters for Saffron Housing Trust from April 2027, with 3.2 GWh annual estimated consumption and consolidated billing.
Supply mains electricity to Saffron Housing Trust's 4 household meters from April 2027, with 0.4 GWh annual consumption and flexible pricing options.
12-month electricity supply contract for Saffron Housing Trust covering 169 meters with 0.9 GWh annual consumption, starting April 2027.