This public procurement contract involves the creation of project documentation, including necessary surveys (e.g., historical building surveys) or their updates. The documentation must meet the requirements for obtaining a project approval according to Act No. 283/2021 Coll., including engineering
Contract awarded. Originally published 11 months ago.
This public procurement contract involves the acquisition of several network infrastructure components, including firewalls, a backup server, and a deduplication storage system. The work includes their implementation and related connection tasks. Key details include: • Supply, installation, and conf
This contract involves ensuring a continuous supply of electrical power for all critical IT systems of the contracting authority. The work includes: (1) acquiring a new central uninterruptible power supply (UPS) with long-term manufacturer support, (2) replacing the existing underperforming motor ge
This public contract involves providing voice and non-voice electronic communication services through electronic communication networks. The services will include related services and supplies as specified in the tender conditions. The contract is for the statutory city of Hradec Králové, including
This public procurement contract aims to ensure a continuous supply of electrical energy for all critical IT systems of the contracting authority. The project includes: (1) acquiring a new central uninterruptible power supply (UPS) with long-term manufacturer support, (2) replacing the existing unde
Design, manufacture, and install a modular building for border agency operations at Port of Dover.
BIM invites tenders for fabrication, installation, and commissioning of four new fire training containers to replace existing units at the National Fisheries College of Ireland in Castletownbere, Cork.
Construction tender for extending the Old Garda Station in Cliffoney, Co. Sligo into a community hub with new extension, stairs, and facilities.
University of Aberdeen seeks qualified contractors for a two-lot framework agreement covering asbestos removal services and independent asbestos analysis, with separate contractors required for each lot.