This contract involves the ongoing supply of brake linings. The buyer, POLREGIO S.A., is seeking suppliers who can provide these essential components for their equipment. The contract is published on the TED platform and has a deadline for submissions by September 30, 2025. Interested suppliers can
Tender closed on 30 Sept 2025. Awaiting award.
This contract opportunity involves the installation of ETCS (European Train Control System) and GSM-R (GSM for Railways) systems. Detailed specifications for the required work can be found in Annex 1 of the contract template, which is included as Annex 1 of the procurement documents. Suppliers are i
This contract opportunity involves the agency sales of travel tickets. Detailed information about the contract is provided in Annex 1 (Description of the premises rented by the contracting authority), Annex 2 (Box office opening hours and duration), and in the contract template (Annex 5). Suppliers
This contract involves the overhaul and repair of wheel sets, including the replacement of monoblock wheels, for bimodal traction units of type 36WEhb (specifically units 36WEhb-005, 36WEhb-006, 36WEhb-007, and 36WEhb-008). The work must comply with the technical documentation of the vehicles and th
This contract involves the fifth-level maintenance repair of the diesel engine with transmission from the SA106-015 vehicle. Detailed specifications and conditions for the execution of this order are included in Annex 1 of the contract template, which is part of Annex 2 to the Terms of Reference (SW
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.