This contract involves the complete construction of a modular building, including the foundation and ground works, reinforced concrete works for connecting to an existing corridor, and the installation of technical building equipment. The project also includes the development of outdoor facilities a
Contract awarded. Originally published 1 years ago.
Only 1 prior award here — too little to read.
In construction, UNIVERSITY MEDICINE OF JOHANNES GUTENBERG UNIVERSITY MAINZ has awarded 1 contract to 1 supplier.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
This contract opportunity involves the maintenance and repair of air conditioning systems in Building 505. The services required include: - Regular maintenance of air conditioning systems - Maintenance of recirculation cooling units - Maintenance of smoke and fire protection dampers - Cleaning and u
The University Medical Center of Johannes Gutenberg University Mainz intends to award a framework agreement for the procurement of the TI Gateway as outlined in the attached documents. A detailed description of the required performance features can be found in the specifications and annexes.
The University Medical Center of Johannes Gutenberg University Mainz intends to award a contract for the procurement of a hospital management system (ZMK) as detailed in the attached documents. This opportunity is aimed at suppliers who can provide a comprehensive software solution for managing hosp
Port of Cork seeks an experienced painting contractor to remove flaking paint and repaint the tower section of its passenger walkway at Ringaskiddy Ferry Port.
Become a supplier of home safety adaptations including handrails, stair rails, and bathroom modifications through Wales' Minor Adaptation Partnership program.
Design, supply, installation and maintenance of fire detection, emergency lighting, WiFi/DAS systems and emergency communication infrastructure at Monaghan General Hospital.
Design and safely remove aged spring hanger assemblies from two reactors at Hinkley Point A as part of the facility's decommissioning programme.