This contract involves the installation of electrical systems for the expansion of the Central Operating Room at the A. Ö. Krankenhaus des Deutschen Ordens Friesach. The project aims to enhance the hospital's operational capabilities by upgrading its electrical infrastructure. Suppliers are invited
Contract awarded. Originally published 1 years ago.
Only 2 prior awards here — too little to read.
In construction, A HOSPITAL OF THE GERMAN ORDER FRIESACH LTD has awarded 2 contracts to 2 suppliers.
Across construction, the most active winners are HOLCIM UK LIMITED, TARMAC TRADING LIMITED, LINDUM GROUP LIMITED — the field to beat, or your route in as a partner.
Water supply infrastructure installation project at Coole Park Nature Reserve including watermain, storage tank, treatment facility, and ducting.
Supply and installation of programmable LED street lighting system on Main Street and Barrack Street in Belmullet, Co. Mayo, including control systems and electrical works.
Bridgetown College Wexford requires a heating centre upgrade including removal of existing oil-fired boiler plant and installation of new LPG-fired heating system.
Full replacement and rehabilitation of Shesknan Bridge in Ireland, including deck replacement, abutment works, demolition, and road reinstatement.