This contract involves the construction of a photovoltaic (PV) system on a green flat roof, with an installed capacity of approximately 80 kWp. The project is being managed by Landkreis Schweinfurt and is valued at €44,143. Suppliers are invited to participate in this opportunity to provide the nece
Contract awarded. Originally published 9 months ago.
The Landkreis Schweinfurt is planning the construction of a new Fire Department Training Center with administrative facilities at the Kreisbauhof in Niederwerrn. This contract opportunity includes flooring works, which consist of the following: preparation of the subfloor for approximately 740 squar
The Landkreis Schweinfurt is planning the construction of a new fire training center with administrative offices at the Kreisbauhof in Niederwerrn. This contract opportunity includes tile work with the following scope: - Wall and floor tiling for office spaces, including: - Wall preparation for a
This procurement opportunity involves carpentry and joinery works, including the following components: - Interior door elements with HPL surface, including primed frame cuts, approximately 48 pieces. - Interior window sills in various depths and lengths, approximately 46 pieces with a total length o
This contract opportunity involves metal construction work, specifically the installation of various types of doors. The scope includes: - Approximately 23 interior door elements with a steel surface, including frames and block frames. - Approximately 6 interior door elements with a steel surface th
Seeking experienced contractors to provide ongoing monitoring, maintenance, and repair services for hydroelectric power generation operations.
Opportunity to supply gas and electricity services to Places for People's property portfolio.
Construction project to build a new Energy Centre facility in Milton Keynes to support local energy infrastructure and supply needs.
NEUPC seeks suppliers to deliver sustainable energy solutions helping universities achieve carbon reduction and net zero commitments through a framework agreement lasting until 2027.