The City of Bydgoszcz is seeking suppliers for the delivery of electricity for the year 2026. The total estimated volume of electricity required is approximately 87,126.11 MWh. The contract is divided into three parts: 1) Supply of electricity to various facilities under different tariff groups, 2)
Tender closed on 19 Sept 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In energy utilities, CITY OF BYDGOSZCZ has awarded 2 contracts to 2 suppliers.
Across energy utilities, the most active winners are Standard Fuel Oils Limited, Certas Energy UK Ltd, Prague Gas Company, a.s. — the field to beat, or your route in as a partner.
This contract involves the maintenance services for floating and stationary fountains, as well as the infrastructure of the Old Bydgoszcz Canal, located in the city of Bydgoszcz. The services must be provided in accordance with the specified requirements outlined in the contract documents, including
The City of Bydgoszcz is leading a public procurement process for the comprehensive supply of high-methane natural gas from January 1, 2026, to December 31, 2027. This contract is divided into six parts, allowing suppliers to bid on any number of sections. The total estimated gas quantity is 236,622
The contract involves providing water rescue services at the indoor swimming pool located at the Astoria Recreation Center, 23 Królowej Jadwigi Street, Bydgoszcz. The services must be delivered according to the specifications outlined in the procurement documents and attachments. A detailed descript
This contract involves the supply of electronic multi-function alarm sirens as specified in the procurement documents, including detailed descriptions and requirements outlined in Annex 1 of the contract. The contracting authority does not anticipate awarding contracts as mentioned in Article 214, p
Guildford Borough Council seeks a contractor to design, supply, install, and commission a roof-mounted solar PV system at The Enterprise Centre, Farnham, as part of its renewable energy and carbon reduction initiative.
Install a 99kW ballast-mounted solar panel system on the West Ham shop roof with inverters and connection to the Stadium electrical network.
Hounslow Council seeks a Strategic Energy Partner to develop and deliver a £500m+ energy infrastructure pipeline supporting borough decarbonisation and net zero goals.
Hounslow Council is seeking a Heat Network Development Partner to design, finance and operate a borough-wide district heating network serving 484 GWh of annual demand, with procurement launching Spring 2027 and £10.55m in government grant funding secured.