    ContractsKaiserhafen III Upgrade Project
    Awarded contract

    Kaiserhafen III Upgrade Project

    Awarded
    €32m
    Published 19 Aug 2025

    This construction project involves the second phase of the renovation of the West Quay and the demolition of the old quay, including excavation to the current harbor floor level. Previously, seven buildings on the construction site have been demolished. A new quay, approximately 230 meters long, wil

    🇩🇪GermanyPublished 19 Aug 2025· 1 year agoviaTED
    Awarded
    €32m
    Published 19 Aug 2025

    Decision brief

    4 fields
    • Contract value
      €32,000,000
      Euros
    • Closing date
      Not published
      No closing date published
    • Sector
      Construction
      Browse related listings
    • Location
      🇩🇪Germany

    Suppliers

    2 suppliers
    • BZ
      BiGE Züblin AG/ Hafen- und Tiefbau GmbH "Unterweser"
    Lead contractor
  1. BZ
    BIGE ZBLIN AG HAFEN UND TIEFBAU GMBH UNTERWESER
    Lead contractor
  2. Lifecycle

    Awarded

    Contract awarded. Originally published 1 year ago.

    19 August 2025
    Awarded — no open tender advertised

    Brief

    This construction project involves the second phase of the renovation of the West Quay and the demolition of the old quay, including excavation to the current harbor floor level. Previously, seven buildings on the construction site have been demolished. A new quay, approximately 230 meters long, will be constructed as a sheet pile structure with a concrete beam and back anchoring. The back anchoring will be created with 1:1 inclined piles. The front edge of the quay is planned to be at a height of NHN +3.02 m. A crane beam will be integrated into the quay structure, with a land-side crane beam built parallel to the quay at a width of 12.00 m. The crane beams will be founded using cast-in-place concrete piles or partial displacement drilled piles. To connect the new quay to the existing quay, a wave wall will be constructed at an angle of approximately 45° into the existing structure, anchored with horizontal anchors and anchor plates. The pier area between the quay beam and the land-side crane beam will have a paved surface with drainage facilities. After the quay is completed, the old quay structure, including pile foundations, will be demolished, and the ground in front of the new quay will be excavated to the required depth. The main works for the Kaiserhafen III upgrade include: Piling works: • Combined sheet pile quay: approx. 230 m • Wave wall for connection to existing quay: approx. 10 m with about 4 horizontal anchors • Foundation for crane tracks: approx. 30 cast-in-place concrete piles and 39 partial displacement drilled piles • Inclined piles: approx. 61 HTM piles and about 9 grouted anchors Concrete works • New quay including crane track: approx. 1,725 m³ • Land-side crane track: approx. 400 m³ Demolition works of the old quay • Heavyweight wall: approx. 5,500 m³ • Pile foundation: approx. 1,380 piles • Wave wall from phase 1: approx. 10 m with bracing, marking, and protective piles Earthworks • Land-based earthworks: approx. 60,000 m³ • Wet dredging: approx. 36,000 m³ Paving works • Paved area: approx. 6,500 m² Equipment • 1 storm pole, deeply founded with a free-standing foundation • Quay equipment consisting of approx. 6 edge poles, 7 access ladders, 14 holding crosses, and 6 cylinder fenders.

    Open in Construction

    4 open listingsView all →
    Construction🇬🇧United Kingdom

    Third-Party Crane Services Framework

    KBS Maritime seeks multiple crane service suppliers to provide surge capacity, specialized lifting, and operative support for maritime operations.

    est.£4,000,000KBS MARITIME LTD
    Published 5 Nov 2026
    Construction🇬🇧United Kingdom

    Plumbing Preventative Maintenance and Reactive Repairs for Hertfordshire Police

    Hertfordshire Police requires plumbing preventative maintenance and reactive repair services for their facilities.

    est.£371,500THE POLICE AND CRIME COMMISSIONER FOR HERTFORDSHIRE
    Published 5 Nov 2026
    OpenConstruction🇬🇧United Kingdom

    Construction of Link Corridor and Associated Works at Boston Leisure Centre

    Boston Borough Council is inviting construction contractors to bid on a link corridor extension and leisure centre improvements at Geoff Moulder Leisure Centre in Boston.

    Boston Borough Council
    Published 5 Nov 2026
    Construction🇬🇧United Kingdom

    Track Repairs for Three Local Allotments

    Supply and install track repairs at three local allotment sites: Brockhurst, Manor Way, and Middlecroft.

    est.£65,000Gosport Borough Council
    Published 5 Nov 2026
    Take action
    View on sourceTED

    Award notice and full record on the publisher's site

    Publisher
    Publications Office of the European Union
    Licence
    EU 2011/833/EU + TED reuse notice
    Source
    ted.europa.eu
    Record ID
    542619-2025

    Your fit

    Could you win the next one?

    This went to BiGE Züblin AG/ Hafen- und Tiefbau GmbH "Unterweser". Sonar reads work like this against your business — who holds it, and whether you could compete or partner next time.

    Check my fit

    Free · Matches every Monday

    Sector
    Construction