This contract opportunity involves the repair of the rectifier substation (GUW) located on Weferlinger Straße. Suppliers are invited to provide their services for this project, which is part of the public transport infrastructure. The work will focus on ensuring the functionality and safety of the e
Tender closed on 15 Sept 2025. Awaiting award.
Only 2 prior awards here — too little to read.
In transport logistics, MAGDEBURGER VERKEHRSBETRIEBE GMBH CO KG has awarded 2 contracts to 2 suppliers.
Across transport logistics, the most active winners are DENNIS EAGLE LIMITED, MAN TRUCK BUS GERMANY LTD, ROSENBAUER DEUTSCHLAND GMBH — the field to beat, or your route in as a partner.
This contract involves the delivery of specialized cables for the construction of the second North-South connection, specifically for section 5, lot 10.01. Suppliers are invited to provide these specialized cables, which are essential for the infrastructure development of the transport network. The
The Magdeburg Transport Company (MVB) is planning to replace the overhead wires and repair the supporting structures in the Alt Fermersleben/Alt Salbke area. This work will take place within the construction boundaries from the Alt Fermersleben UNT KS 12 track separator to the tensioning point at Lü
This contract involves the construction of the Geißlerstraße facility, focusing on the technical equipment and building structure. Suppliers are invited to provide machinery and services necessary for the successful completion of this project. The buyer, Magdeburger Verkehrsbetriebe GmbH & Co. KG, i
Teesside International Airport is recruiting a taxi service provider to deliver passenger ground transportation with guaranteed 15-minute maximum wait times and future hydrogen vehicle capability.
Doncaster Council seeks two ranked suppliers for a 48-month framework agreement to provide heavy commercial vehicle parts and consumables with estimated annual spend of £50,000.
Southern Water seeks fuel card services for a 1200-vehicle fleet with annual fuel costs of £2 million.
Translink seeks suppliers to provide and install a replacement Brush Box assembly and high-pressure water Dust Suppression System for railway ballast regulators, including full installation and technical support for a 12-month contract with possible extensions.